Levy Information: Frequently Asked Questions
What did the 2010-2020 Plant Facilities Levy pay for?
The following list includes facilties-related items that Plant Facilities Levy funds have paid for since 2010. To read the full report, click here. The Plant Facilities Levy also paid for technology and safety. To read about technology and safety expenses, click here.
Bellevue Elementary
Geo Project Elevated (Ventilation and Cooling)
Drop Ceiling
Fire Sprinkler System
Lighting and Occupancy Sensors
Door Retrofit
Water Fixture Retrofit
Multipurpose Room Addition
Carey Elementary School
Geo Project Elevated (Ventilation and Cooling)
Covered Walkway between buildings
Door Retrofit
Install Drop Ceiling
Repair Ductwork Insulation
Fire Sprinkler System
Lighting and Occupancy Sensors
Window Retrofit
Irrigation Improvement
Water Fixture Retrofit
Carey Secondary and Gymnasium
Geo Project Elevated (Ventilation and Cooling)
Retro-Commissioning
Lighting and Occupancy Sensors
Domestic Hot Water set point adjustment
Community Campus Building
Geo Project
Install Drop Ceiling
Fire Sprinkler System
Lighting and Occupancy Sensors
Door Retrofit
Water Fixture Retrofit
Carpet
Auditorium improvements
Hailey Elementary School
Geo Project Elevated (Cooling)
Kitchen Remodel
Install Drop Ceiling
Transformer Move
Fire Sprinkler System
Lighting and Occupancy Sensors
Carpet / Flooring Replacement
Door Retrofit
Window Retrofit
Irrigation Improvement
Water Fixture Retrofit
Hemingway Elementary
Geo Project Elevated (Ventilation and Cooling)
Carpet Replacement
Solution to East Side of Building (ice)
Door Retrofit
Hemingway Site and Addition
Lighting and Occupancy Sensors
Water Fixture Retrofit
Furniture
Silver Creek High School/DSS Building
Geo Project
HVAC Retrofit
Lighting and Occupancy Sensors
Wood River High School
Geo Project
Geo Wells for Campus
Lighting and Occupancy Sensors
Install VFD on HP loop pumps
Retro-Commission
Irrigation Improvement
Wood River Middle School
Lighting and Occupancy Sensors
Install VFD on HP loop pumps
Retro-Commission
Solar Array - pilot Funds moved to IAQ improvements
WRMS Irrigation Well Project
WRMS Gym Remodel (partial)
Alturas Elementary School
Lighting and Occupancy Sensors
Install VFD on HP loop pumps
Alturas 16-17 projects
Miscellaneous Projects
WRMS Addition
Carey School Site Improvements
Maintenance/Food Storage Building
Safety/Security, Interior/Exterior Cameras
Radios
UPS Backup all sites
Generator for Technology Building
Air Conditioning for Technology Building
Hailey Cobblestone Contribution (cross-walk)
Hailey Additional Classrooms
Solar Grant
Woodside Elementary Remodel
Silver Creek High School
Administrative and Consultant
Legal Fees for Judicial Confirmation for Qualified School Construction Bonds (QSCB)
Legal Fees
US Bank Fees
Architectural Fees
Consultant Fees
Debt payments
Interest
QSCB Issuance Costs
Technology
Fiber Build to All Sites
Wiring Cat 6
Network Routing and Switching
Interactive Classrooms: Projector, Interactive Board, Sound System, Response Systems
Hardware Replacement: Desktops, Laptops
Innovative Technology Grants
Chromebooks
Security Door and Camera
Servers
Wireless
There is still an outstanding balance of approximately $16.6M in future debt and interest payments that the District is obligated to pay over the course of the next three years.